VERDE.TEC FORUM 2018
Prof. Michael Gr. Vrachopoulos (R&D Head of Renewable | Kravvaritis & Partners | Consulting Engineers) presentation, regarding Social Energy Networks & Geothermal Energy Exploitation in Urban developments.
Prof. Michael Gr. Vrachopoulos (R&D Head of Renewable | Kravvaritis & Partners | Consulting Engineers) presentation, regarding Social Energy Networks & Geothermal Energy Exploitation in Urban developments.
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Hellas Gold SA (www.hellas-gold.com) to undertake the Detailed Design (Mechanical / electrical & automation installations), Equipment technical evaluation, Pre - commissioning / Commissioning procedures & Start - up assistance, for the installation of a new PY-ASPY concentrate production line at Stratoni Mine Flotation Plant. The
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by ASPROFOS ENGINEERING (www.asprofos.gr) to undertake the detailed design for the upgrade of an existing 2300kW-th water-cooled process cooling system at DIAXON’s SA (Plastic Packaging Materials) BOPP film plant (www.diaxon.gr). The BOPP film plant is located in Komotini’s Industrial Park and has been in full operation
First Prize by the ECOPOLIS 2012 Awards for the Sustainable Urban Redesign (in Greece). First Prize by the ECOPOLIS 2017 Awards for Environmental Projects (in Greece). The aim of the design was the improvement of the microclimate in the area, namely reduction of surface temperature and air temperature during the summer season, improving the conditions
The new medical diagnostic center of IATROPOLIS SA at Keratsini / Greece is now under full operation. With this 9m€ investment IATROPOLIS group expands its activities in the primary care market. The center stretches over three floors, with total area of 1200m², and is staffed by a total of 60 doctors and skilled health workers.
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by “Κ&Ρ Chem kft” to undertake the Electrical Installations Detailed Design, for a new Chemical Plant (Sodium Alcohol Ethoxy Sulphates, Linear Alkyl Benzene Sulphonic Acids, Alkyl Betaines, Alkyl Amides, Amineoxides and other specialty products) at Hungary. The site is located in industrial Park Szolnok /
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Hellas Gold SA (www.hellas-gold.com) to undertake the Basic Design, Detailed Design (Mechanical / electrical & automation installations), Equipment technical evaluation, Construction supervision, Pre - commissioning / Commissioning procedures, Start - up assistance, Construction & Operation Permitting Services, for the installation of a new tailings dewatering
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by PRASINOS SA (www.prasinossa.gr)to undertake the MEP final design, for the renovation of an existing 9800m² building & its conversion to a Maritime Company headquarters. The site is located in Kifissia / Greece.
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by ADM SA (http://adm.net.gr/) to undertake the Protective Device Coordination Study (Over current protective device coordination & selectivity / Equipment damage curve plotting – TCC) & Sequence-of-Operation Fault Analysis (Device operation sequence graphical visualization / Detailed relay actions / Sequence of events / Normalized time current
Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by ASPROFOS ENGINEERING (www.asprofos.gr) to undertake the MEP final design, for the conversion of a 5000m² industrial building to Indoor Athletics & Cultural Center. The site is located in Elefsina / Greece.