News

IATROPOLIS SA – New Medical Center at Keratsini

By |2017-11-21T01:52:51+02:00March 10th, 2017|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by IATROPOLIS SA (www.iatropoli.gr) & ARENVI Architects (www.arenvi.com) to undertake the MEP final & detailed design, for a new 1050m² Medical Center at Keratsini. The site is located in Athens / Greece.

ATTIKO METRO – LINE 3

By |2017-11-21T01:52:40+02:00December 20th, 2016|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by ADM SA (http://adm.net.gr/) to undertake the PROTECTIVE DEVICE COORDINATION STUDY (Over current protective device coordination & selectivity / Equipment damage curve plotting – TCC) & SEQUENCE-OF-OPERATION FAULT ANALYSIS (Device operation sequence graphical visualization / Detailed relay actions / Sequence of events / Normalized time current

ETAP official user

By |2017-11-21T01:52:31+02:00November 10th, 2016|News|

ETAP software (https://etap.com/) offers the most comprehensive and integrated suite of power system enterprise solution that spans from modeling to operation.Renewable | Kravvaritis & Partners | Consulting Engineers, as official user of ETAP, provides high quality, comprehensive, integrated design & analysis engineering consulting services for:Power Generation PlantsTransmission & Distribution NetworksIndustrial & Transportation NetworksLow Voltage Installations

Hybrid Geothermal Project in the news

By |2017-11-21T01:52:11+02:00September 10th, 2016|News|

The Municipality of Nea Ionia (www.neaionia.gr) implements the Project «Geothermal System of Remote Air Conditioning and other RES Applications», which has been included in the Program «European Economic Area (EEA) Grants for the period 2009−2014» (http://eeagrants.org/, www.eeagrants.gr) and specifically in the Section of «Renewable Energy Sources». The Program was created by Iceland, Lichtenstein and

COEUR ROCHESTER PROJECT

By |2017-11-21T01:52:01+02:00August 5th, 2016|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by KNIGHT PIESOLD CONSULTING (www.knightpiesold.com) to offer 3D design support services, for the installation of a new 18'' valve station for Stage IV Heap Leach Pad at COEUR ROCHESTER MINE. The solution distribution system flows range from 9000gpm to 14000gpm pumping up to 600 feet

Mine Water Treatment Plants

By |2017-11-21T01:51:27+02:00May 15th, 2016|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Hellas Gold SA (www.hellas-gold.com) to undertake the Basic Design, Detailed Design (Mechanical / electrical & automation installations), Equipment technical evaluation, Construction supervision, Pre - commissioning / Commissioning procedures, Start - up assistance, Construction & Operation Permitting Services, for the following projects: Olympias Mine Water Treatment

Go to Top