Olympias Mine Expansion

Project Details

Location

Olympias Mine – Chalkidiki – Greece

Client

ELDORADO GOLD CORP. / HELLAS GOLD SA

Year

2012-Ongoing

Description

Rehabilitation & expansion of the existing Olympias mine. The expansion includes:
Four (4) new dewatering stations with pumping capacity 1300m³/h @ 65bar each
— Power Distribution (20kV / 6.3kV / 0.69kV / 0.4kV) with total power of 35MVA
— Ventilation (5 fans 250m³/sec + 2 fans 120m³/sec)
— Fire Safety Installations
— Industrial Water Supply
— Fuel Storage & Distribution
— Communication (Leaky Feeder) & CCTV system

Services

  • Basic Design
  • Detailed Design (mechanical / electrical & automation installations)
  • Equipment technical evaluation
  • Construction supervision
  • Pre – commissioning / Commissioning procedures
  • Start – up assistance
  • Construction & Operation Permitting Services