Olympias Mine Water Treatment Plant Expansion
Project Details
Location
Olympias Mine – Chalkidiki – Greece
Client
ELDORADO GOLD CORP. / HELLAS GOLD SA
Year
2016-on going
Description
Reconstruction & upgrade of the existing mine water treatment plant with total volume of 700 m³, with working load 600 m³/h @ PH 6,5 (mine water input) & set output PH 8,5
Services
- Basic Design
- Detailed Design (mechanical / electrical & automation installations)
- Equipment technical evaluation
- Construction supervision
- Pre – commissioning / Commissioning procedures
- Start – up assistance
- Construction & Operation Permitting Services