Olympias Mine Water Treatment Plant Expansion

Project Details

Location

Olympias Mine – Chalkidiki – Greece

Client

ELDORADO GOLD CORP. / HELLAS GOLD SA

Year

2016-on going

Description

Reconstruction & upgrade of the existing mine water treatment plant with total volume of 700 m³, with working load 600 m³/h @ PH 6,5 (mine water input) & set output PH 8,5

Services

  • Basic Design
  • Detailed Design (mechanical / electrical & automation installations)
  • Equipment technical evaluation
  • Construction supervision
  • Pre – commissioning / Commissioning procedures
  • Start – up assistance
  • Construction & Operation Permitting Services

Similar Projects