News

Ikaria’s Hybrid Energy System

By |2017-11-21T01:48:18+02:00July 10th, 2013|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by ENET SA (www.enetsa.gr) to undertake the MEP detail engineering design, of Ikaria’s Hybrid Energy System. The project is composed by the following main parts: - An existing dam at Pezi at 720m above sea level with a capacity of 900.000m3. - A HES at Proespera with

ANANGEL Maritime Headquarters

By |2017-11-21T01:47:49+02:00May 20th, 2013|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by DIMAND SA (www.dimand.gr) to undertake the final & detailed design, permitting, construction supervision and commissioning for a Vertical & Horizontal Geothermal Closed Loop HVAC system, with total thermal power of 400 kW-th/c, for ANANGEL’s Maritime Headquarters Building. The project is located in Athens / Greece.

Olympias Mine Rehabilitation & Expansion

By |2017-11-21T01:47:25+02:00January 1st, 2013|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Hellas Gold SA (www.hellas-gold.com) to undertake Basic Design, Detailed Design (Mechanical / electrical & automation installations), Equipment technical evaluation, Construction supervision, Pre - commissioning / Commissioning procedures, Start - up assistance, Construction & Operation Permitting Services for the Rehabilitation & expansion of the existing Olympias

Florina Indoor Swimming Center

By |2017-11-21T01:47:18+02:00October 15th, 2012|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Municipality of Florina (www.cityoflorina.gr), in order to provide Energy Audit, Energy Code Compliance & Energy Upgrade design Services, for FLORINA’s Indoor Swimming Center, with total area of 3300 m². The project is located in Florina / Greece.

Mine Concentrator Plant Rehabilition

By |2017-11-21T01:47:03+02:00August 5th, 2012|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Hellas Gold SA (www.hellas-gold.com) to undertake the auditing, permitting, engineering, design, construction supervision and commissioning of the Olympias mine concentrator plant rehabilitation. The fully refurbished plant was designed for a throughput of 800,000 tons per annum (tpa) for adjacent Olympias mine tailings re-processing. The concentrator

Pylos Town Hall

By |2017-11-21T01:46:51+02:00June 16th, 2012|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by Municipality of Pylos (www.pylos-nestor.gr), in order to provide Energy Audit, Energy Code Compliance & Energy Upgrade design Services, for Pylos Town hall Building, with total area of  1150 m². The project is located in Prefecture of Messinia / Greece.

BNP PARIBAS Athens Headquarters

By |2017-11-21T01:46:37+02:00January 10th, 2012|News|

Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by KION ARCHITECTS (www.kion-arch.gr), in order to provide Energy Audit, Energy Code Compliance & Energy Upgrade design Services, for the BNP PARIBAS Athens Headquarters building, with total area of  7800 m². The project is located in Athens / Greece.

Go to Top