Renewable | Kravvaritis & Partners | Consulting Engineers, appointed by KNIGHT PIESOLD CONSULTING (www.knightpiesold.com) to offer 3D design support services, for the installation of a new 18” valve station for Stage IV Heap Leach Pad at COEUR ROCHESTER MINE. The solution distribution system flows range from 9000gpm to 14000gpm pumping up to 600 feet (Static) using 1200Hp and 700hp vertical turbine pumps.

The project is located in NEVADA USA.